Ownership

Canadian Zinc Corporation owns 100% of the Project which comprises two surface leases covering 132 Ha, twelve mining leases covering an area of 7355 Ha and one additional mineral claims covering 731 Ha as follow:

Canadian Zinc Corporation: Prairie Creek Mineral Tenure, October 2011

Mineral Claims

ML #

Record #

Expiry Date

Anniversary renewal date

Area ha

Area acres

Mining Lease

ML 5113

F67134 (Gate 1)

Sept 9-2030

Sep-09

794.4

1,963.00

Mining Lease

ML 5114

F67135 (Gate 2)

Sept 9-2030

Sep-09

1,039.64

2,569.00

Mining Lease

ML 5115

F67136 (Gate 3)

Sept 9-2030

Sep-09

944.13

2,333.00

Mining Lease

ML 5116

F67137 (Gate 4)

Sept 9-2030

Sep-09

1,036.00

2,560.00

Claim

K01365

WAY 1

n/a

0.00

0.00

Claim

K01366

WAY 2

n/a

0.00

0.00

Claim

K01367

WAY 3

n/a

0.00

0.00

Claim

K01368

WAY 4

n/a

0.00

0.00

Claim

K01369

WAY 5

November-01-13

Nov-01

731.57

1,807.75

Claims total

4545.74

11,232.75

Surface Leases

Surface Lease

95F/10-5-5

Minesite

March 31-2012

Mar-31

113.6

280.74

Surface Lease

95F/10-7-4

Airstrip

March 31-2012

Mar-31

18.2

45.07

Surface Lease total

131.8

325.81

Mining Leases

Mining Lease

ML 2854

Zone 8-12

August-22-19

Aug-22

743

1,836.00

Mining Lease

ML 2931

Zone 4-7

August-05-20

Aug-05

909

2,246.18

Mining Lease

ML 2932

Zone 3

August-05-20

Aug-05

871

2,152.00

Mining Lease

ML 2933

Rico West

August-05-20

Aug-05

172

425

Mining Lease

ML 3313

Samantha

July-13-31

Jul-13

420.05

1,037.96

Mining Lease

ML 3314

West Joe

July-13-31

Jul-13

195.86

483.99

Mining Lease

ML 3315

Miterk

July-13-31

Jul-13

43.7

107.98

Mining Lease

ML 3338

Rico

July-17-32

Jul-17

186.16

460

Mining Leases total

3,540.77

8,749.11

Property Taxes

Property Taxes

Airstrip

Aug 17-10

Aug-17

Property Taxes

Minesite

Aug 17-10

Aug-17

Grand Total

8,218.31

20,307.67

 

Property Claims

Canadian Zinc Corporation has a 100% interest in the plant and equipment located at the Project site.

  • Mill - The 1,000 tonne/day mill is 90% complete.
  • Road - A 170 km winter road connects the site to the Liard Highway. The road was last used in 1981/82 to equip the mill and mine site.
  • Airstrip - A 1,000 m gravel airstrip is located approximately 1 km to the north of the camp.
  • Tailings Disposal- A tailings impoundment area is immediately adjacent to and northwest of the camp.
  • Camp Accommodations - Trailer accommodations for 240 people are on site with kitchen facilities to meet a full camp complement of employees.
  • Maintenance Shops - Well equipped machine shop and heavy equipment shop.
  • Heavy Equipment fleet including Bulldozers, Loaders, Cranes, all terrain dump trucks, self loading scrapers, cement trucks, a portable crushing screening and concrete batching plant, an excavator, a Dragline and numerous other items of good quality construction equipment.
  • Office and Warehouse - Office and warehouse facilities include a dry, first aid, mine rescue and recreation facilities.
  • Laboratory - A pre-engineering laboratory building exists behind the mill. Power Supply - Four 1.1 megawatt Cooper Bessemer diesel powered generators and two smaller standby generators.
  • Fuel Supply and Storage - Bulk capacity steel diesel storage tanks containing around 400,000 gallons of diesel fuel and gasoline tanks with associated loading, unloading and pumping facilities. A number of large capacity propane tanks containing in excess of 100 tons of propane, support heating for the camp and the mine.

Three levels of underground workings are developed on the vein with the mill level being the lowest.

Factbook

Here is an excerpt from the Canadian Zinc Factbook.

PDF Please click this link to download our factbook in PDF format (12MB).

Prairie Creek Mine Site

Back to top Back To Top

HomeAbout UsPrairie Creek MineInvestor InformationCorporate GovernanceStock QuotesImage GalleryRequest InfoContact InfoSite Map

 Back to previous page  Back to top  Print Page Legal DisclaimerWebsite Redesign © 1999 - Canadian Zinc Corporation