| Ownership: |
| Canadian Zinc Corporation owns 100% of the Project which comprises eight mining leases covering an area of 8,750 acres and five additional mineral claims covering 10,204 acres. |
| Canadian Zinc Corporation has a 60% interest in the plant and equipment located at the Project site, with an agreement that the remaining 40% will be transferred to it upon the payment of a total of Cdn$8.2 million under a 2% net smelter royalty agreement ("NSR") with Titan Pacific Resources Ltd. One half of the 40% interest will be transferred to Canadian Zinc Corporation when NSR payments have totalled Cdn$3.2 million and the remainder when additional NSR payments have totalled Cdn$5.0 million, whereupon the NSR will be terminated. |
| Facilities at the site comprise the following: | |
| Mill - The 1000 tonne/day mill is 90% complete. | |
| Road - A 170 km winter road connects the site to the Liard Highway. The road was last used in 1981/82 to equip the mill and mine site. | |
| Airstrip - A 1,000 m gravel airstrip is located approximately 1 km to the north of the camp. | |
| Tailings Disposal - A tailings impoundment area is immediately adjacent to and northwest of the camp. | |
| Camp Accommodations - Trailer accommodations for 240 people are on site with kitchen facilities to meet a full camp complement of employees. | |
| Maintenance Shops - Well equipped machine shop and heavy equipment shop. | |
| Heavy Equipment fleet including Bulldozers, Loaders, Cranes, all terrain dump trucks, self loading scrapers, cement trucks, a portable crushing screening and concrete batching plant, an excavator, a Dragline and numerous other items of good quality construction equipment. | |
| Office and Warehouse - Office and warehouse facilities include a dry, first aid, mine rescue and recreation facilities. | |
| Laboratory - A pre-engineering laboratory building exists behind the mill. | |
| Power Supply - Four 1.1 megawatt Cooper Bessemer diesel powered generators and two smaller standby generators. | |
| Fuel Supply and Storage - Bulk capacity steel diesel storage tanks containing around 400,000 gallons of diesel fuel and gasoline tanks with associated loading, unloading and pumping facilities. A number of large capacity propane tanks containing in excess of 100 tons of propane, support heating for the camp and the mine. | |
| Three levels of underground workings are developed on the vein with the mill level being the lowest. | |